Our history
1995
established:annual maintenance for power plants,inspection and
maintenance engineering.
1998
developed:power plant dense phase positive pressure ash removing system
engineering.
2001
developed:central negative pressure ash suction system engineering.
2002
developed:water purified plant active carbon addition system
engineering.
2004
developed:power plant botton ash handling system engineering.
2005
developed:sand injection and limestone injection for fluidized bed
boilers.
Our mottos
Innovation、Sharing、Service、Duty
Our inspirations
Responsibility、Fighting
strength、Executing strength
Our partners
AG PORT |