新增網頁1
   
 
 
新增網頁1
 
   
 

Our history

  1995 established:annual maintenance for power plants,inspection and maintenance engineering.

  1998 developed:power plant dense phase positive pressure ash removing system engineering.

  2001 developed:central negative pressure ash suction system engineering.

  2002 developed:water purified plant active carbon addition system engineering.

  2004 developed:power plant botton ash handling system engineering.

  2005 developed:sand injection and limestone injection for fluidized bed boilers.

 

Our mottos

   InnovationSharingServiceDuty

 

Our inspirations

   ResponsibilityFighting strengthExecuting strength

 

Our partners

   AG PORT